AA Machinery

Phone, Buttons Block

Time Lapse Video – Machinery Rigging with 300 Ton Gantries

Erecting one of two, prefabricated distillation column modules in a pharmaceutical facility.  Each module, at  13’x14’x34’ long  and weighing 58,000# each, was brought in on its side and uprighted within a zero overhead clearance environment using 300 ton hydraulic gantry system at full extension.

Contact Us

captcha

Members Logos