Table of contents

Share

Top Project Images – 2018

Rigging is an art form in its own right. And a picture is worth a thousand words.

What better way to show off our experiences, capabilities, and innovative solutions than with project images taken by our craft professionals, project managers, and other team members from the past twelve months.

We’ve worked with many great customers over the past year on a variety of projects. Through our work, we’ve been able to compile a large number of images taken  on job sites and at our shop. Pictures taken on job sites were submitted into our monthly photo contest and winners were picked.

Below are our top project images from 2018. You can view our top project images of 2017 here.

Let us know your thoughts on social media: LinkedInInstagram, & Facebook with the hashtag #movewithAA

Projects

Rigging a 50T pressure vessel with a set of gantry posts
Rigging a 50T pressure vessel with a set of gantry posts

50T pressure vessel, lowered into a pit 12 ft. below the floor. Using a 60/80 Versa-Lift and a pair of J&R gantry legs, our crew only had inches to spare.

90 ft. double girder overhead bridge crane replacement.
90 ft. Double Girder OH Bridge Crane Replacement

90 ft. double girder overhead bridge crane replacement using two Versa-Lifts & a tri-lifter.

110,000 lb. press brake rigging
110,000 lb. press brake rigging

The "King" is leaving the building. Removing and hauling a 110,000 lb. King Turret press and installing in its new location.

Our crew relocating an 18ft. long, 11ft. high vessel from a local University physics lab on a double-drop trailer.
Our crew relocating an 18ft. long, 11ft. high vessel from a local University physics lab on a double-drop trailer.

Providing some high-value hauling for a local University. Our crew relocating an 18ft. long, 11ft. high vessel from the physics lab. Declared value of the vessel was $5M.

Rigging and removal of 14 reactors
Rigging and removal of 14 reactors

Removal process of 14 reactors from a nutritional product plant during a demolition project.

Relocation of HAAS at machine shop
Relocation of HAAS at machine shop

Relocating a HAAS at a local machining shop under the stars and bars. Our friends over at Hart Mechanical took this photo of the job.

Disassembling 150T Manipulator at heavy industrial forging operation
Disassembling 150T Manipulator at heavy industrial forging operation

Disassembling the 150T Manipulator at heavy industrial forging operation.

Unloading New 6080 Versa-Lift
Unloading New 6080 Versa-Lift

Unloading the new 60/80 Versa-Lift being added to our fleet at our facility.

Pharma reactor skid rigging
Pharma reactor skid rigging

Standing and placing in location a reactor skid; part of a multi-reactor system module. Each reactor skid was brought into the plant through a wall penetration.

300T press offloading using two Versa-Lifts remotely
300T press offloading using two Versa-Lifts remotely

Offloading a new 300T press with two Versa-Lifts. Operators are using the two Versa-Lifts remotely, working in tandem.

Standing up new 300T press with two Versa-Lifts
Standing up new 300T press with two Versa-Lifts

With little head room above the press, two Versa-Lifts work in tandem to stand up the new 300T press within the machine shop.

4 1/2 MW Solar Generator Removal
4 1/2 MW Solar Generator Removal

4 1/2 MW solar generator removal. The generating portion of the unit weighed 25,000 lbs. The unit was in confined spaces in the basement of a local college, which offered up some challenges.

A&A EIC Award Best in Specialty Rigging
A&A EIC Award Best in Specialty Rigging

A&A won the Excellence in Construction Award - Best in Specialty Rigging by the Associated Builders & Contractors Association of East PA.

50,000 lb. gear box rigging with gantry posts
50,000 lb. gear box rigging with gantry posts

Replacing a 50,000 lb. gear box that had been in place since 1964. Here, the new gear box is being lowered into the pit using gantry posts.

G5 steam turbine generator rigging
G5 steam turbine generator rigging

Our crew removing a G5 generator system from its location for relocation at a power plant using slider and unified hydraulic system.

G5 steam turbine condenser gantry rigging
G5 steam turbine condenser gantry rigging

Two sets of gantry posts placing the G5 steam turbine condenser in storage prior to the system being sold at an auction.

Prefab Concrete Building Rigging
Prefab Concrete Building Rigging

55,000 lb. prefabricated concrete communication hut being placed in location by 60/80 Versa-Lift with hydraulic boom attachment.

Mobile MRI trailer rigging with BPI forklift
Mobile MRI trailer rigging with BPI forklift

Rainy and muddy conditions couldn't stop our crews placing in location a 60,000 lb. mobile MRI trailer. Our BPI rough terrain forklift was used to place the MRI trailer on concrete pads.

Gantry posts set up to remove and stage a few gas compressor cylinders from a 8V-250 engine frame they were attached to.
Gantry posts set up to remove and stage a few gas compressor cylinders from a 8V-250 engine frame they were attached to.

Gantry posts set in place to remove and stage a few gas compressor cylinders from a 8V-250 engine frame they were attached to.

Rigging is an art form in its own right. And a picture is worth a thousand words.

What better way to show off our experiences, capabilities, and innovative solutions than with project images taken by our craft professionals, project managers, and other team members from the past twelve months.

We’ve worked with many great customers over the past year on a variety of projects. Through our work, we’ve been able to compile a large number of images taken  on job sites and at our shop. Pictures taken on job sites were submitted into our monthly photo contest and winners were picked.

Below are our top project images from 2018. You can view our top project images of 2017 here.

Let us know your thoughts on social media: LinkedInInstagram, & Facebook with the hashtag #movewithAA

Projects

Rigging a 50T pressure vessel with a set of gantry posts
Rigging a 50T pressure vessel with a set of gantry posts

50T pressure vessel, lowered into a pit 12 ft. below the floor. Using a 60/80 Versa-Lift and a pair of J&R gantry legs, our crew only had inches to spare.

90 ft. double girder overhead bridge crane replacement.
90 ft. Double Girder OH Bridge Crane Replacement

90 ft. double girder overhead bridge crane replacement using two Versa-Lifts & a tri-lifter.

110,000 lb. press brake rigging
110,000 lb. press brake rigging

The "King" is leaving the building. Removing and hauling a 110,000 lb. King Turret press and installing in its new location.

Our crew relocating an 18ft. long, 11ft. high vessel from a local University physics lab on a double-drop trailer.
Our crew relocating an 18ft. long, 11ft. high vessel from a local University physics lab on a double-drop trailer.

Providing some high-value hauling for a local University. Our crew relocating an 18ft. long, 11ft. high vessel from the physics lab. Declared value of the vessel was $5M.

Rigging and removal of 14 reactors
Rigging and removal of 14 reactors

Removal process of 14 reactors from a nutritional product plant during a demolition project.

Relocation of HAAS at machine shop
Relocation of HAAS at machine shop

Relocating a HAAS at a local machining shop under the stars and bars. Our friends over at Hart Mechanical took this photo of the job.

Disassembling 150T Manipulator at heavy industrial forging operation
Disassembling 150T Manipulator at heavy industrial forging operation

Disassembling the 150T Manipulator at heavy industrial forging operation.

Unloading New 6080 Versa-Lift
Unloading New 6080 Versa-Lift

Unloading the new 60/80 Versa-Lift being added to our fleet at our facility.

Pharma reactor skid rigging
Pharma reactor skid rigging

Standing and placing in location a reactor skid; part of a multi-reactor system module. Each reactor skid was brought into the plant through a wall penetration.

300T press offloading using two Versa-Lifts remotely
300T press offloading using two Versa-Lifts remotely

Offloading a new 300T press with two Versa-Lifts. Operators are using the two Versa-Lifts remotely, working in tandem.

Standing up new 300T press with two Versa-Lifts
Standing up new 300T press with two Versa-Lifts

With little head room above the press, two Versa-Lifts work in tandem to stand up the new 300T press within the machine shop.

4 1/2 MW Solar Generator Removal
4 1/2 MW Solar Generator Removal

4 1/2 MW solar generator removal. The generating portion of the unit weighed 25,000 lbs. The unit was in confined spaces in the basement of a local college, which offered up some challenges.

A&A EIC Award Best in Specialty Rigging
A&A EIC Award Best in Specialty Rigging

A&A won the Excellence in Construction Award - Best in Specialty Rigging by the Associated Builders & Contractors Association of East PA.

50,000 lb. gear box rigging with gantry posts
50,000 lb. gear box rigging with gantry posts

Replacing a 50,000 lb. gear box that had been in place since 1964. Here, the new gear box is being lowered into the pit using gantry posts.

G5 steam turbine generator rigging
G5 steam turbine generator rigging

Our crew removing a G5 generator system from its location for relocation at a power plant using slider and unified hydraulic system.

G5 steam turbine condenser gantry rigging
G5 steam turbine condenser gantry rigging

Two sets of gantry posts placing the G5 steam turbine condenser in storage prior to the system being sold at an auction.

Prefab Concrete Building Rigging
Prefab Concrete Building Rigging

55,000 lb. prefabricated concrete communication hut being placed in location by 60/80 Versa-Lift with hydraulic boom attachment.

Mobile MRI trailer rigging with BPI forklift
Mobile MRI trailer rigging with BPI forklift

Rainy and muddy conditions couldn't stop our crews placing in location a 60,000 lb. mobile MRI trailer. Our BPI rough terrain forklift was used to place the MRI trailer on concrete pads.

Gantry posts set up to remove and stage a few gas compressor cylinders from a 8V-250 engine frame they were attached to.
Gantry posts set up to remove and stage a few gas compressor cylinders from a 8V-250 engine frame they were attached to.

Gantry posts set in place to remove and stage a few gas compressor cylinders from a 8V-250 engine frame they were attached to.

Top Project Images – 2018

Rigging is an art form in its own right. And a picture is worth a thousand words.

What better way to show off our experiences, capabilities, and innovative solutions than with project images taken by our craft professionals, project managers, and other team members from the past twelve months.

We’ve worked with many great customers over the past year on a variety of projects. Through our work, we’ve been able to compile a large number of images taken  on job sites and at our shop. Pictures taken on job sites were submitted into our monthly photo contest and winners were picked.

Below are our top project images from 2018. You can view our top project images of 2017 here.

Let us know your thoughts on social media: LinkedInInstagram, & Facebook with the hashtag #movewithAA

Projects

Rigging a 50T pressure vessel with a set of gantry posts
Rigging a 50T pressure vessel with a set of gantry posts

50T pressure vessel, lowered into a pit 12 ft. below the floor. Using a 60/80 Versa-Lift and a pair of J&R gantry legs, our crew only had inches to spare.

90 ft. double girder overhead bridge crane replacement.
90 ft. Double Girder OH Bridge Crane Replacement

90 ft. double girder overhead bridge crane replacement using two Versa-Lifts & a tri-lifter.

110,000 lb. press brake rigging
110,000 lb. press brake rigging

The "King" is leaving the building. Removing and hauling a 110,000 lb. King Turret press and installing in its new location.

Our crew relocating an 18ft. long, 11ft. high vessel from a local University physics lab on a double-drop trailer.
Our crew relocating an 18ft. long, 11ft. high vessel from a local University physics lab on a double-drop trailer.

Providing some high-value hauling for a local University. Our crew relocating an 18ft. long, 11ft. high vessel from the physics lab. Declared value of the vessel was $5M.

Rigging and removal of 14 reactors
Rigging and removal of 14 reactors

Removal process of 14 reactors from a nutritional product plant during a demolition project.

Relocation of HAAS at machine shop
Relocation of HAAS at machine shop

Relocating a HAAS at a local machining shop under the stars and bars. Our friends over at Hart Mechanical took this photo of the job.

Disassembling 150T Manipulator at heavy industrial forging operation
Disassembling 150T Manipulator at heavy industrial forging operation

Disassembling the 150T Manipulator at heavy industrial forging operation.

Unloading New 6080 Versa-Lift
Unloading New 6080 Versa-Lift

Unloading the new 60/80 Versa-Lift being added to our fleet at our facility.

Pharma reactor skid rigging
Pharma reactor skid rigging

Standing and placing in location a reactor skid; part of a multi-reactor system module. Each reactor skid was brought into the plant through a wall penetration.

300T press offloading using two Versa-Lifts remotely
300T press offloading using two Versa-Lifts remotely

Offloading a new 300T press with two Versa-Lifts. Operators are using the two Versa-Lifts remotely, working in tandem.

Standing up new 300T press with two Versa-Lifts
Standing up new 300T press with two Versa-Lifts

With little head room above the press, two Versa-Lifts work in tandem to stand up the new 300T press within the machine shop.

4 1/2 MW Solar Generator Removal
4 1/2 MW Solar Generator Removal

4 1/2 MW solar generator removal. The generating portion of the unit weighed 25,000 lbs. The unit was in confined spaces in the basement of a local college, which offered up some challenges.

A&A EIC Award Best in Specialty Rigging
A&A EIC Award Best in Specialty Rigging

A&A won the Excellence in Construction Award - Best in Specialty Rigging by the Associated Builders & Contractors Association of East PA.

50,000 lb. gear box rigging with gantry posts
50,000 lb. gear box rigging with gantry posts

Replacing a 50,000 lb. gear box that had been in place since 1964. Here, the new gear box is being lowered into the pit using gantry posts.

G5 steam turbine generator rigging
G5 steam turbine generator rigging

Our crew removing a G5 generator system from its location for relocation at a power plant using slider and unified hydraulic system.

G5 steam turbine condenser gantry rigging
G5 steam turbine condenser gantry rigging

Two sets of gantry posts placing the G5 steam turbine condenser in storage prior to the system being sold at an auction.

Prefab Concrete Building Rigging
Prefab Concrete Building Rigging

55,000 lb. prefabricated concrete communication hut being placed in location by 60/80 Versa-Lift with hydraulic boom attachment.

Mobile MRI trailer rigging with BPI forklift
Mobile MRI trailer rigging with BPI forklift

Rainy and muddy conditions couldn't stop our crews placing in location a 60,000 lb. mobile MRI trailer. Our BPI rough terrain forklift was used to place the MRI trailer on concrete pads.

Gantry posts set up to remove and stage a few gas compressor cylinders from a 8V-250 engine frame they were attached to.
Gantry posts set up to remove and stage a few gas compressor cylinders from a 8V-250 engine frame they were attached to.

Gantry posts set in place to remove and stage a few gas compressor cylinders from a 8V-250 engine frame they were attached to.

Rigging is an art form in its own right. And a picture is worth a thousand words.

What better way to show off our experiences, capabilities, and innovative solutions than with project images taken by our craft professionals, project managers, and other team members from the past twelve months.

We’ve worked with many great customers over the past year on a variety of projects. Through our work, we’ve been able to compile a large number of images taken  on job sites and at our shop. Pictures taken on job sites were submitted into our monthly photo contest and winners were picked.

Below are our top project images from 2018. You can view our top project images of 2017 here.

Let us know your thoughts on social media: LinkedInInstagram, & Facebook with the hashtag #movewithAA

Projects

Rigging a 50T pressure vessel with a set of gantry posts
Rigging a 50T pressure vessel with a set of gantry posts

50T pressure vessel, lowered into a pit 12 ft. below the floor. Using a 60/80 Versa-Lift and a pair of J&R gantry legs, our crew only had inches to spare.

90 ft. double girder overhead bridge crane replacement.
90 ft. Double Girder OH Bridge Crane Replacement

90 ft. double girder overhead bridge crane replacement using two Versa-Lifts & a tri-lifter.

110,000 lb. press brake rigging
110,000 lb. press brake rigging

The "King" is leaving the building. Removing and hauling a 110,000 lb. King Turret press and installing in its new location.

Our crew relocating an 18ft. long, 11ft. high vessel from a local University physics lab on a double-drop trailer.
Our crew relocating an 18ft. long, 11ft. high vessel from a local University physics lab on a double-drop trailer.

Providing some high-value hauling for a local University. Our crew relocating an 18ft. long, 11ft. high vessel from the physics lab. Declared value of the vessel was $5M.

Rigging and removal of 14 reactors
Rigging and removal of 14 reactors

Removal process of 14 reactors from a nutritional product plant during a demolition project.

Relocation of HAAS at machine shop
Relocation of HAAS at machine shop

Relocating a HAAS at a local machining shop under the stars and bars. Our friends over at Hart Mechanical took this photo of the job.

Disassembling 150T Manipulator at heavy industrial forging operation
Disassembling 150T Manipulator at heavy industrial forging operation

Disassembling the 150T Manipulator at heavy industrial forging operation.

Unloading New 6080 Versa-Lift
Unloading New 6080 Versa-Lift

Unloading the new 60/80 Versa-Lift being added to our fleet at our facility.

Pharma reactor skid rigging
Pharma reactor skid rigging

Standing and placing in location a reactor skid; part of a multi-reactor system module. Each reactor skid was brought into the plant through a wall penetration.

300T press offloading using two Versa-Lifts remotely
300T press offloading using two Versa-Lifts remotely

Offloading a new 300T press with two Versa-Lifts. Operators are using the two Versa-Lifts remotely, working in tandem.

Standing up new 300T press with two Versa-Lifts
Standing up new 300T press with two Versa-Lifts

With little head room above the press, two Versa-Lifts work in tandem to stand up the new 300T press within the machine shop.

4 1/2 MW Solar Generator Removal
4 1/2 MW Solar Generator Removal

4 1/2 MW solar generator removal. The generating portion of the unit weighed 25,000 lbs. The unit was in confined spaces in the basement of a local college, which offered up some challenges.

A&A EIC Award Best in Specialty Rigging
A&A EIC Award Best in Specialty Rigging

A&A won the Excellence in Construction Award - Best in Specialty Rigging by the Associated Builders & Contractors Association of East PA.

50,000 lb. gear box rigging with gantry posts
50,000 lb. gear box rigging with gantry posts

Replacing a 50,000 lb. gear box that had been in place since 1964. Here, the new gear box is being lowered into the pit using gantry posts.

G5 steam turbine generator rigging
G5 steam turbine generator rigging

Our crew removing a G5 generator system from its location for relocation at a power plant using slider and unified hydraulic system.

G5 steam turbine condenser gantry rigging
G5 steam turbine condenser gantry rigging

Two sets of gantry posts placing the G5 steam turbine condenser in storage prior to the system being sold at an auction.

Prefab Concrete Building Rigging
Prefab Concrete Building Rigging

55,000 lb. prefabricated concrete communication hut being placed in location by 60/80 Versa-Lift with hydraulic boom attachment.

Mobile MRI trailer rigging with BPI forklift
Mobile MRI trailer rigging with BPI forklift

Rainy and muddy conditions couldn't stop our crews placing in location a 60,000 lb. mobile MRI trailer. Our BPI rough terrain forklift was used to place the MRI trailer on concrete pads.

Gantry posts set up to remove and stage a few gas compressor cylinders from a 8V-250 engine frame they were attached to.
Gantry posts set up to remove and stage a few gas compressor cylinders from a 8V-250 engine frame they were attached to.

Gantry posts set in place to remove and stage a few gas compressor cylinders from a 8V-250 engine frame they were attached to.

Share

Stay in the loop

Subscribe to our free newsletter.